Production Day 3 - The Bad Guy

On the third day of shooting we did all the Bad guy shots, because that required the most props so we did all of those shots in one day to be practical, these involved close ups and medium shots of the Bad guy laughing and the trying on of outfits

Problems
The trying on of clothes shots took very long to prepare for as the actor would have to keep changing his clothes before every shot. however to save time we decided to place all the clothes onto the actor and do a continuos shot of him he would then take the layers off revealing a new outfit.
We had problems trying to add a lightning effects onto the shot and this was difficult to do in the room with the equipment we had. We would have to switch the light on and on again and again and then add the sounds onto the film later on.

What went well
We did complete all the shots ahead of schedule and upload them unto the mac. part of this is down to our time saving ideas and the fact we were well prepared for the shots we needed to do that day,
Even thought one of our group was not there that day we still managed to do well without him being there and it did not affect our production.

Roles
Camera - Brad, Elliot
Lighting - Brad, Elliot
Acting - Jack